Pool rehabilitation
-Demolition of the old terrace.
-Extension of the swimming pool from 10 to 12 meters in length.
-Reduction of pool depths from a maximum depth of 3 m to 1.80 meters, resulting in significant water savings by reducing the volume, lower chemical consumption, and savings in electricity by reducing filtration hours.
-Gunite re-cast inside the old pool.
-Covered with Reviglass 2.5x2.5 white mosaic tiles.
-Concreting and cladding of the new terrace.
-New ASTRALPOOL filtration and disinfection equipment
Locality:Santa Cristina d'Aro - Girona
Year of construction:2013